Seed Home 2 Quality Control: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "This refers to build qaulity and code compliance, and how to negotiate it effectively. =Inspection Schedule= *Feedback on Inspection Schedule")
 
 
Line 3: Line 3:
=Inspection Schedule=
=Inspection Schedule=
*[[Feedback on Inspection Schedule]]
*[[Feedback on Inspection Schedule]]
=Seed Home Entrepreneur Contract=
Clear delivery must be encoded in a contract, such that quality control points are addressed:
#Custom design audit - Seed Home Entrepreneur (SHE) publishes custom design package on their log. OSE audits the design modification.
#BOM

Latest revision as of 18:59, 30 August 2020

This refers to build qaulity and code compliance, and how to negotiate it effectively.

Inspection Schedule

Seed Home Entrepreneur Contract

Clear delivery must be encoded in a contract, such that quality control points are addressed:

  1. Custom design audit - Seed Home Entrepreneur (SHE) publishes custom design package on their log. OSE audits the design modification.
  2. BOM