Time to Build a House: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "12 month owner builder, 8 month custom, 6 months spec https://eyeonhousing.org/2015/08/how-long-does-it-take-to-build-a-single-family-home/#:~:text=The%202014%20Survey%20of%2...")
 
No edit summary
Line 1: Line 1:
12 month owner builder, 8 month custom, 6 months spec
12 month owner builder, 8 month custom, 6 months spec [https://eyeonhousing.org/2015/08/how-long-does-it-take-to-build-a-single-family-home/#:~:text=The%202014%20Survey%20of%20Construction,months%20to%20finish%20the%20construction.]
 
https://eyeonhousing.org/2015/08/how-long-does-it-take-to-build-a-single-family-home/#:~:text=The%202014%20Survey%20of%20Construction,months%20to%20finish%20the%20construction.

Revision as of 20:20, 26 February 2021

12 month owner builder, 8 month custom, 6 months spec [1]