Seed Eco-Home 3 Data Collection: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 1: | Line 1: | ||
=Subfloor Installation= | =Subfloor Installation= | ||
*2 hours for install, 3 people working on it half the time, 2 people working rest of the time. No sill gasket or clips installed. Screwing in with 2" screws. | *2 hours for install, 3 people working on it more than half the time, 2 people working rest of the time. No sill gasket or clips installed. Screwing in with 2" screws. | ||
=Wall Installation Rate= | =Wall Installation Rate= | ||
*Second 2-40 of video shows 22 modules installed (38 seconds). [[Time Lapse Calculator]] show 38 seconds at 30 fps playback and 4 second shooting interval means 1:16 hours realtime. 76/22 = about 3.5 minutes per wall module in DSLR cameras - link - | *Second 2-40 of video shows 22 modules installed (38 seconds). [[Time Lapse Calculator]] show 38 seconds at 30 fps playback and 4 second shooting interval means 1:16 hours realtime. 76/22 = about 3.5 minutes per wall module in DSLR cameras - link - | ||
*Akaso footage shows 50 seconds - at 3 second interval - 1:15 hour realtime. | *Akaso footage shows 50 seconds - at 3 second interval - 1:15 hour realtime. | ||
*'''Major success.''' | *'''Major success.''' |
Revision as of 13:52, 6 September 2021
Subfloor Installation
- 2 hours for install, 3 people working on it more than half the time, 2 people working rest of the time. No sill gasket or clips installed. Screwing in with 2" screws.
Wall Installation Rate
- Second 2-40 of video shows 22 modules installed (38 seconds). Time Lapse Calculator show 38 seconds at 30 fps playback and 4 second shooting interval means 1:16 hours realtime. 76/22 = about 3.5 minutes per wall module in DSLR cameras - link -
- Akaso footage shows 50 seconds - at 3 second interval - 1:15 hour realtime.
- Major success.