Inspection Schedule: Difference between revisions
Jump to navigation
Jump to search
(→Links) |
(→Links) |
||
Line 8: | Line 8: | ||
=Links= | =Links= | ||
*[[Plumbing Inspection]] | *[[Plumbing Inspection]] - foundation, rough-in, final | ||
*[[KC Inspections]] | *[[KC Inspections]] | ||
*[[Rough-In Plumbing Inspection]] | *[[Rough-In Plumbing Inspection]] | ||
*[[Rough-In Electrical Inspection]] | *[[Rough-In Electrical Inspection]] | ||
*{{check}}'''[[Under Construction Phase Inspections]]''' | *{{check}}'''[[Under Construction Phase Inspections]]''' |
Revision as of 22:16, 3 May 2022
- The rough inspection should be performed before the insulation is installed. This is not stated as a requirement, but a suggestion here. [1]
- Rough-in inspection can also occur after insulation is in, but it may be more difficult to perform inspection. [2]
OSE Case
- No insulation covers any wiring or plumbing work.
- Air test of water supply - leave a test port in water supply for air pressure testing or water pressure testing.
- Smoke detectors are required on the electrical side - [3]
Links
- Plumbing Inspection - foundation, rough-in, final
- KC Inspections
- Rough-In Plumbing Inspection
- Rough-In Electrical Inspection
Under Construction Phase Inspections