SEH CAD Tasks: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
|  (Created page with "#'''Plumbing''' - move the main drain to the front of the house so it is under the wall cavity.") | No edit summary | ||
| Line 1: | Line 1: | ||
| #'''Plumbing''' - move the main drain to the front of the house so it is under the wall cavity. | #'''Plumbing''' - move the main drain to the front of the house so it is under the wall cavity. | ||
| #'''Decorative Band on Top''' - needs CAD detail | |||
| #'''Second Floor''' - all modules to become 9'. | |||
Latest revision as of 00:29, 5 July 2022
- Plumbing - move the main drain to the front of the house so it is under the wall cavity.
- Decorative Band on Top - needs CAD detail
- Second Floor - all modules to become 9'.