Revision as of 16:18, 18 February 2023
Build Items:
- Exterior trim
- Door installation
- Siding
Done
- Foundation trim - 8 hr + 4 hrs = 11 hrs + 20 min rivets
- Stairs
- Landing
- Canopy
- Behind tub and behind stair sheet and insulation
- Front porch
- 2nd floor ceiling insulation
- 2nd floor ceiling
- Interior sill plates sketches on 2nd floor
- Sill plates on first floor
- Power center
- Inverter
- PV
- Heat pump
- Trellis
- Interior frame, electrical, plumbing
- Beadboard
- Paint interior
- Kitchen cabinets
- Bathroom
- Finish floor
- Driveway
- Sewer
- Water
- Power connection
- Landscaping - tree spade etc
Design Items:
- Garage deck
- Build order doc - walls/insul/landing/stair/etc
- Inverter
- Power center and trenching
- Canopy
- Trellis
- Overall garage top build order doc