Sat Feb 10 2023 Notes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
'''Build Items:''' | '''Build Items:''' | ||
#Exterior trim | #Exterior trim + corners | ||
#Door installation | #Door installation | ||
#Siding | #Siding |
Revision as of 16:19, 18 February 2023
Build Items:
- Exterior trim + corners
- Door installation
- Siding
Done
- Foundation trim - 8 hr + 4 hrs = 11 hrs + 20 min rivets
- Stairs
- Landing
- Canopy
- Behind tub and behind stair sheet and insulation
- Front porch
- 2nd floor ceiling insulation
- 2nd floor ceiling
- Interior sill plates sketches on 2nd floor
- Sill plates on first floor
- Power center
- Inverter
- PV
- Heat pump
- Trellis
- Interior frame, electrical, plumbing
- Beadboard
- Paint interior
- Kitchen cabinets
- Bathroom
- Finish floor
- Driveway
- Sewer
- Water
- Power connection
- Landscaping - tree spade etc
Design Items:
- Garage deck
- Build order doc - walls/insul/landing/stair/etc
- Inverter
- Power center and trenching
- Canopy
- Trellis
- Overall garage top build order doc