17 Trades: Difference between revisions
		
		
		
		
		
		Jump to navigation
		Jump to search
		
				
		
		
	
|  (→Design) | |||
| Line 24: | Line 24: | ||
| #Gutter hanger | #Gutter hanger | ||
| #Insulation installer | #Insulation installer | ||
| #Driveway installer - we like pervious pavement | |||
| Then after one can do all of the above, they qualify for | Then after one can do all of the above, they qualify for | ||
| Line 30: | Line 30: | ||
| #Developer | #Developer | ||
| After doing all of the above, an OSE-spec builder can then move on to design.   | After doing all of the above, an OSE-spec builder can then move on to design. | ||
| =Design= | =Design= | ||
Revision as of 21:17, 28 May 2023
Site
- Surveyor
- Soil scientist
- Structural Engineer
- Civil Engineer
Builder
- Equipment operator
- Carpenter
- Plumber
- Electrician
- HVAC
- Roofing
- Siding installer
- Drywall and ceiling installer
- Foundation and concrete
- Landscaping
- Painter
- Flooring/Carpet Installer
- PV installer
- Kitchen cabinet maker
- Gutter hanger
- Insulation installer
- Driveway installer - we like pervious pavement
Then after one can do all of the above, they qualify for
- General Contractor
- Developer
After doing all of the above, an OSE-spec builder can then move on to design.
Design
- Integrated House Designer
- Drafter - blueprints
- Interior design
- Landscape design
- Electrical design
- Plumbing design