=Narrative=
=Narrative=
The current program of OSE is building an Apprenticeship program to a core model of 24 builders who build one house in 5 days on an ongoing basis. Given the robust build cost of $85k in materials and labor (75% proven) for a  1000 hour build of a 1300 sf Seed Eco-Home at $60k materials budget that includes the 6kW of rooftop photovoltaics - we expect this system to be highly scalable.
The current program of OSE is building an Apprenticeship program to a core model of 24 builders who build one house in 5 days on an ongoing basis. Given the robust build cost of $85k in materials and labor (75% proven) for a  1000 hour build of a 1300 sf Seed Eco-Home at $60k materials budget that includes the 6kW of rooftop photovoltaics - we expect this system to be highly scalable.The 24 person crew is expected to produce about 50 homes per year, such that if the core staff modules of 24 each - of Integrated Teacher-Builder/Teachers-Students are created - a highly scalable staffing model is developed.


Once the single operation of 24 work-study crews is demonstrated,  
The apprentices are signing up for a 4 year OSE program with intent of continuing with OSE on a program of lifelong learning. They set their own pay via competency documented in the Rapid Learning Facility.
 
The Rapid Learning facility is a facility of about 16 dedicated bays structures for learning, documentation, data collection, and  a
 
Once the single operation of 24 work-study crews is demonstrated,


=Budget=
=Budget=

Revision as of 10:20, 15 August 2023

Narrative

The current program of OSE is building an Apprenticeship program to a core model of 24 builders who build one house in 5 days on an ongoing basis. Given the robust build cost of $85k in materials and labor (75% proven) for a 1000 hour build of a 1300 sf Seed Eco-Home at $60k materials budget that includes the 6kW of rooftop photovoltaics - we expect this system to be highly scalable.The 24 person crew is expected to produce about 50 homes per year, such that if the core staff modules of 24 each - of Integrated Teacher-Builder/Teachers-Students are created - a highly scalable staffing model is developed.

The apprentices are signing up for a 4 year OSE program with intent of continuing with OSE on a program of lifelong learning. They set their own pay via competency documented in the Rapid Learning Facility.

The Rapid Learning facility is a facility of about 16 dedicated bays structures for learning, documentation, data collection, and a

Once the single operation of 24 work-study crews is demonstrated,

Budget

  • 6 builder/teachers - $50k each - $300k
  • Infrastructure improvement - Rapid Learning Facility - $250k 12 bays of rapid learning content for carpentry, electrical, plumbing, PV, foundnation work, hardscape, landscaping
  • 3D Printing Facility
  • Solar Concrete Facility
  • Admissions/Marketing - $75k staff, $50k