(Created page with "Once exterior walls are done, interior walls may be installed. There is a specific procedure for interior work, which involves marking of '''everything''': Work doc for SEH...")
 
No edit summary
 
Line 1: Line 1:
Once exterior walls are done, interior walls may be installed. There is a specific procedure for interior work, which involves marking of '''everything''':
Once exterior walls are done, interior walls may be installed. There is a specific procedure for interior work, which involves marking of '''everything''':
 
*Wall, floor, ceiling apertures - vents, lights, wires, plumbing, heat pump, electrical boxes. These may be interior or exterior, where waterproofing is done after the framing and before insulation.
 
*Footprints of structures- eg landing, cabinets, toilet, tub, etc. Important to mark 
*
Work doc for SEH 4 - [https://docs.google.com/presentation/d/1HqEL-KNTwGVzpZ4IUoZgkKPCX9_1ahXcBzTx9wZc1KY/edit#slide=id.g2ae5df59e67_0_154]
Work doc for SEH 4 - [https://docs.google.com/presentation/d/1HqEL-KNTwGVzpZ4IUoZgkKPCX9_1ahXcBzTx9wZc1KY/edit#slide=id.g2ae5df59e67_0_154]

Latest revision as of 23:11, 11 January 2024

Once exterior walls are done, interior walls may be installed. There is a specific procedure for interior work, which involves marking of everything:

  • Wall, floor, ceiling apertures - vents, lights, wires, plumbing, heat pump, electrical boxes. These may be interior or exterior, where waterproofing is done after the framing and before insulation.
  • Footprints of structures- eg landing, cabinets, toilet, tub, etc. Important to mark

Work doc for SEH 4 - [1]