Design for Minimum Integration: Difference between revisions
Jump to navigation
Jump to search
(Created page with "Design in which the integration of expansion takes only the effort of expansion build and expansion install. This means, ideally, no deconstruction or modification of existing...") |
No edit summary |
||
Line 1: | Line 1: | ||
Design in which the integration of expansion takes only the effort of expansion build and expansion install. This means, ideally, no deconstruction or modification of existing structure. | Design in which the integration of expansion takes only the effort of expansion build and expansion install. This means, ideally, no deconstruction or modification of existing structure. | ||
This must consider finishing detail, and not only rough build. It must be capable of long-life design, but can also be deconstructed easily. |
Latest revision as of 23:45, 27 October 2024
Design in which the integration of expansion takes only the effort of expansion build and expansion install. This means, ideally, no deconstruction or modification of existing structure.
This must consider finishing detail, and not only rough build. It must be capable of long-life design, but can also be deconstructed easily.