CEB Press Documentation: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
|||
Line 5: | Line 5: | ||
=Fabrication Procedure= | =Fabrication Procedure= | ||
#Prepare all required tools (complete documentation of tools used) | #Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this) | ||
#Purchase stock metal and other components (several full, well-organized pages are needed here) | #Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this) | ||
##Stock steel | ##Stock steel (pictures from first build are desirable here) | ||
##Hydrauilics | ##Hydrauilics (complete lists already documented on wiki, need to be organized) | ||
##Controller | ##Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added) | ||
[[Category:CEB Press Documentation]] | [[Category:CEB Press Documentation]] |
Revision as of 19:54, 6 June 2011
Introduction
This marks the first epic effort at organizing CEB Documentation towards a complete fabrication procedure with all supporting materials. Several attempts have been tried over the last 3 years, none of which were ripe for success as much as this one.
Fabrication Procedure
- Prepare all required tools (complete documentation of tools used - Chris F at Factor e Farm can do this)
- Purchase stock metal and other components (several full, well-organized pages are needed here; older pages should be mined for this)
- Stock steel (pictures from first build are desirable here)
- Hydrauilics (complete lists already documented on wiki, need to be organized)
- Controller (v0.1 should be documented; v0.2 by Dorkmo, and v0.3 by Blair of Detroit Fab Lab should be added)