Concrete Mix Rates
About
- 1:3:3 is 3000 PSI.[3]
- 1/6 concrete is water
- Concrete mix is 10-15% cement
- Portland cement costs $13/bag 93 lb [Portland Cement Type IL - 92.6 - 94 lbs at Menards® [