=Mon Aug 4, 2025= | =Mon Aug 4, 2025= | ||
*Header - used tiedown strap to pull in sides, as right side was 1.5" off vertical. Cut header to fit. Nailed through king stud. [https://photos.app.goo.gl/P1kSZRivyDomwHFGA] | *Header - used tiedown strap to pull in sides, as right side was 1.5" off vertical. Cut header to fit. Nailed through king stud. [https://photos.app.goo.gl/P1kSZRivyDomwHFGA]. Album - [https://photos.app.goo.gl/KE69C2NtMXvnd3Y76] | ||
=Sat Aug 2, 2025= | =Sat Aug 2, 2025= |
Latest revision as of 21:37, 4 August 2025
Work Doc
Mon Aug 4, 2025
- Header - used tiedown strap to pull in sides, as right side was 1.5" off vertical. Cut header to fit. Nailed through king stud. [1]. Album - [2]
Sat Aug 2, 2025
- Major lessons - no mods to modules.
- Numbered and prepared ahead of time.
- Major block once the T caps entered - blocking was impossible so it meant drilling holes to attach blocking. And slitting the OSB, weakening shear capacity.