Max Log: Difference between revisions
| Line 66: | Line 66: | ||
* Installed tar flashing tape in french door frame | * Installed tar flashing tape in french door frame | ||
[[File:Door flashing tape.jpg|thumb|French door tar flashing tape]] | |||
Lunch: 12:40pm-1:35pm | Lunch: 12:40pm-1:35pm | ||
| Line 72: | Line 74: | ||
* Installed french door | * Installed french door | ||
[[File:French door deck.jpg|thumb|French door installed]] | |||
* Leveled part of front porch a bit better to fit front porch wall | * Leveled part of front porch a bit better to fit front porch wall | ||
Revision as of 02:07, 9 November 2025
Build Pictures
- Upload - [1]
Time Log
Write down morning work done, lunch time, and afternoon work done.
Fri Nov 7, 2025
Morning: -
Afternoon: 1:00pm-5:50pm
- Installed back & front porch trim spacers
- Started installing cedar shingles on front porch wall
Thu Nov 6, 2025
Morning: 10:20am-1:10pm
- Installed 6x6 posts on front porch
Afternoon: 2:30pm-5:50pm
- Installed sheet metal roofing on front porch
Wed Nov 5, 2025
Morning: 10:00am-12:45pm
- Carried gravel bags onto roof
- Shimmed & squared french door
Lunch: 12:45pm-2:50pm
Afternoon: 2:50pm-5:50pm
- Replaced front porch boards under french door
- Lifted up all 3 front porch roof modules
- Fixed rear of all 3 front porch roof modules to house wall
Tue Nov 4, 2025
Morning: 10:30am-12:40pm
- Added more screws to back porch sheet metal roof, was flapping in the wind
- Started on french door installation
- Installed tar flashing tape in french door frame
Lunch: 12:40pm-1:35pm
Afternoon: 1:35pm-5:05pm
- Installed french door
- Leveled part of front porch a bit better to fit front porch wall
- Installed second front porch wall
- Carried all 3 front porch roof modules to front of building for installation
Mon Nov 3, 2025
Morning: 10:25am-2:40pm
- Installed back porch walls
- Built back porch 2nd roof module
Lunch: 2:40pm-3:55pm
Afternoon: 3:55pm-6:00pm
- Installed back porch roof modules
- Installed back porch 4x4 post
- Installed back porch metal roofing
Sat Nov 1, 2025
Morning: 10:00am-12:00pm
- Installed flashing tape on both sliding doors
- Built back veranda walls
Lunch: -
Afternoon: 12:00pm-4:30pm
- Leveled, positioned, and fixed front porch beneath sliding doors
Fri Oct 31, 2025
Morning: 10:25am-2pm
- Finished 2nd window installation
- Build back veranda frame and installed planks
Lunch: 2pm-3:35pm
Afternoon: 3:35pm-7pm
- Finished back veranda deck
- Started back veranda wall frames
- Screwed in 2nd rear veranda door frame
Thu Oct 30, 2025
Morning: 10:00am-12:00pm
- Trimmed PV runners
- Fixed up PV runner cap 2x4 on the 3rd module
- Folded up roof membrane at the south side to fit with PV runner cap 2x4s
- Installed some 1x6 roof trim
Lunch: -
Afternoon: 12:00pm-6:45pm
- Installed siding
- Cut opening for east side windows
- Installed flashing tar tape on both window frames
- Installed first window
- Started installation of second window
Wed Oct 29, 2025
Morning: 10:10am-12:15pm
- Installed PV panels
Lunch: 12:15pm-1:40pm
Afternoon: 1:40pm-7pm
- Finished installing PV panels
- Trimmed roof membrane on east side of building to fit trim boards
- Started installing trim boards on roof
Tue Oct 28, 2025
Morning: 10:05am-12:45pm
- Installed 2nd sliding door handle/lock and adjusted roller (~5min total)
- Put up R38 fiberglass insulation into the ceiling, covered about 5 rows
Lunch: 12:45pm-1:45pm
Afternoon: 1:45pm-5:15pm
- Sealed cracks & gaps between wall modules & rafters/taper with spray foam
- Finished ceiling insulation in the first 2 house modules
- Started insulating wall modules in house module 1 with R19 fiberglass
- Started taking off some of the floor level OSB strips to fill in gaps behind them with spray foam (in house module 3)
Mon Oct 27, 2025
Morning: 10:05am-2:30pm
- Helped attach roof rafter braces
- Started attaching some PV panels
Lunch: 2:30pm-3:30pm
Afternoon: 3:30pm-6:20pm
- Measured out PV spacing on most runners
- Attached front PV mounts on most runners
- Finished installing first row of PV panels
Evening (non-work):
- Spent 2h after work learning/trying out FreeCAD 1.0