Factor e Farm Infrastructure Buildout 2011: Difference between revisions
Jump to navigation
Jump to search
Line 1: | Line 1: | ||
=Introduction= | =Introduction= | ||
2011 marks the buildout of Factor e Farm for the purpose of absorbing 12 people full time with comfortable accommodations and work space. We are planning on using the CEB press and strawbale insulation as the core of the built environment. The planned infrastructure buildout includes 6 superinsulated studios, 6 more 3-season studios, common kitchen, common shower/bathroom, supporting electrical power and internet infrastructure, and a 3000 square foot workshop addition | 2011 marks the buildout of Factor e Farm for the purpose of absorbing 12 people full time with comfortable accommodations and work space. We are planning on using the CEB press and strawbale insulation as the core of the built environment, as an application of [[Modular CEB Construction]]. The planned infrastructure buildout includes 6 superinsulated studios, 6 more 3-season studios, common kitchen, common shower/bathroom, supporting electrical power and internet infrastructure, and a 3000 square foot workshop addition. | ||
=Infrastructure Plan= | =Infrastructure Plan= |
Revision as of 22:37, 18 June 2011
Introduction
2011 marks the buildout of Factor e Farm for the purpose of absorbing 12 people full time with comfortable accommodations and work space. We are planning on using the CEB press and strawbale insulation as the core of the built environment, as an application of Modular CEB Construction. The planned infrastructure buildout includes 6 superinsulated studios, 6 more 3-season studios, common kitchen, common shower/bathroom, supporting electrical power and internet infrastructure, and a 3000 square foot workshop addition.
Infrastructure Plan
We will allocate $60k to this project as follows:
- $1k - baler
- $4k - fully automatic CEB press (2 total)
- $3.5k -
- $2k - 20 kW-hr forklift battery bank
- $1k - 5 kW inverter, 24V
- $2k -