Factor e Farm Infrastructure Buildout 2011: Difference between revisions
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
We will allocate $60k to this project as follows: | We will allocate $60k to this project as follows: | ||
*$1k - baler | *$3k - sawmill build, $1500 in materials, and $1500 in labor | ||
*$4k - fully automatic CEB press (2 total) | *$1k - square baler purchase | ||
*$ | *$500 - sickle bar purchase | ||
*$500 - hay rake purchase | |||
*$4k - fully automatic CEB press build (2 total will be available at Factor e Farm for the construction season) | |||
*$5.5k - 3 more Power Cubes to support 2 tractors at 54 hp each and 2 CEB presses | |||
*$2k - 20 kW-hr forklift battery bank | *$2k - 20 kW-hr forklift battery bank | ||
*$ | *$2k - [2] 10 kW inverter, 24VDC/240VAC, for additional workshop power | ||
*$2k - | *$2k - | ||
[[Category:Infrastructure]] | [[Category:Infrastructure]] |
Revision as of 22:42, 18 June 2011
Introduction
2011 marks the buildout of Factor e Farm for the purpose of absorbing 12 people full time with comfortable accommodations and work space. We are planning on using the CEB press and strawbale insulation as the core of the built environment, as an application of Modular CEB Construction. The planned infrastructure buildout includes 6 superinsulated studios, 6 more 3-season studios, common kitchen, common shower/bathroom, supporting electrical power and internet infrastructure, and a 3000 square foot workshop addition.
Infrastructure Plan
We will allocate $60k to this project as follows:
- $3k - sawmill build, $1500 in materials, and $1500 in labor
- $1k - square baler purchase
- $500 - sickle bar purchase
- $500 - hay rake purchase
- $4k - fully automatic CEB press build (2 total will be available at Factor e Farm for the construction season)
- $5.5k - 3 more Power Cubes to support 2 tractors at 54 hp each and 2 CEB presses
- $2k - 20 kW-hr forklift battery bank
- $2k - [2] 10 kW inverter, 24VDC/240VAC, for additional workshop power
- $2k -