Main Cylinder Top/2nd Cyl Bottom Mounts: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
(Created page with "*Cut 6x12x1/2" plate *Drill 4 holes on 2 pin holes on each plate *Weld 1" drilled out nut onto plates *Bolt to arms Category:Fabrication Procedures")
 
No edit summary
Line 1: Line 1:
*Cut 6x12x1/2" plate
*Cut 1/2"X6"x12" plate
*Drill 4 holes on 2 pin holes on each plate
*Cut 1/2"x4"x6" plate
*Weld 1" drilled out nut onto plates
*Mag drill [4] 3/4" holes in 6"x12: plate
*Bolt to arms
*Mag drill [2] 1" pin holes on each 4"x6" plate
*Weld 1" drilled out nut onto 4"x6" plates
*Weld assembly together with cylinder pin in place (prevents shifting)
*Lay assembly in place on frame, and pin bottom of main cylinder into it
 


[[Category:Fabrication Procedures]]
[[Category:Fabrication Procedures]]

Revision as of 01:28, 19 June 2011

  • Cut 1/2"X6"x12" plate
  • Cut 1/2"x4"x6" plate
  • Mag drill [4] 3/4" holes in 6"x12: plate
  • Mag drill [2] 1" pin holes on each 4"x6" plate
  • Weld 1" drilled out nut onto 4"x6" plates
  • Weld assembly together with cylinder pin in place (prevents shifting)
  • Lay assembly in place on frame, and pin bottom of main cylinder into it