Spring Break Operations Manual: Difference between revisions
Jump to navigation
Jump to search
(Created page with "=About= Design of a spring break program for 24 participants. \ =Staff= *Hospitality - cooking and living space, signage, waste, garden, =Future Infrastructure Upgrades= *Production aquaponic greenhouse *Pervious paver driveways, with 3D printed block") |
(→Staff) |
||
| Line 5: | Line 5: | ||
*Hospitality - cooking and living space, signage, waste, garden, | *Hospitality - cooking and living space, signage, waste, garden, | ||
=24 Unit Program= | |||
*Prototypes | |||
=Program= | |||
*Day 1 - [[4 Hour Construction Boot Camp]] | |||
*Day 2 - [[4 Hour House Design Boot Camp]] | |||
=Future Infrastructure Upgrades= | =Future Infrastructure Upgrades= | ||
*Production aquaponic greenhouse | *Production aquaponic greenhouse | ||
*Pervious paver driveways, with 3D printed block | *Pervious paver driveways, with 3D printed block | ||
Revision as of 16:24, 10 February 2026
About
Design of a spring break program for 24 participants. \
Staff
- Hospitality - cooking and living space, signage, waste, garden,
24 Unit Program
- Prototypes
Program
- Day 1 - 4 Hour Construction Boot Camp
- Day 2 - 4 Hour House Design Boot Camp
Future Infrastructure Upgrades
- Production aquaponic greenhouse
- Pervious paver driveways, with 3D printed block