Spring Break Operations Manual: Difference between revisions
Jump to navigation
Jump to search
(→Staff) |
|||
| Line 16: | Line 16: | ||
*Day 1 - Welcome presentation, half hour, and half hour intros. [[2 Hour Construction Boot Camp]] + practice wall module build - total 4 hours morning. | *Day 1 - Welcome presentation, half hour, and half hour intros. [[2 Hour Construction Boot Camp]] + practice wall module build - total 4 hours morning. | ||
** Afternoon: 2 hour production. 2 hour AI Assisted FreeCAD design: how to design just about anything. Part Library work - process overview, sample part generation. | ** Afternoon: 2 hour production. 2 hour AI Assisted FreeCAD design: how to design just about anything. Part Library work - process overview, sample part generation. | ||
*Day 2 - [[2 Hour House Design Boot Camp]] | *Day 2 - [[2 Hour House Design Boot Camp]]. Building Cabin 1. | ||
**Afternoon - PV installation - Hangar. 2 hr CAD design - Part library work - designing plumbing. | |||
*Day 3 - [[2 Hour PV System + Roofless Roof Design Bootcamp and Design Session]]. Building Cabin 2. | |||
**Afternoon - PV installation - Hangar. 2 hr CAD design -Part library work - designing electrical. | |||
*Day 4 - [[2 Hour Heat Pump and Thermal Battery Design Boot Campand Design Session]]. Building Cabin 3. | |||
**Afternoon - PV installation - Hangar. 2 hr CAD design - Part library work - designing power center. | |||
*Day 5 - House Design Finalization. Building Cabin 3. | |||
**Afternoon - PV installation - Hangar. 2 hr CAD design -Part library work - designing HVAC. | |||
*Day 6 - [[Village Design Boot camp and Design Session]]. Building Cabin 3. | |||
**Afternoon - PV installation - Hangar. 2 hr CAD design -Part library work - designing HVAC. | |||
=Future Infrastructure Upgrades= | =Future Infrastructure Upgrades= | ||
*Production aquaponic greenhouse | *Production aquaponic greenhouse | ||
*Pervious paver driveways, with 3D printed block | *Pervious paver driveways, with 3D printed block | ||
Revision as of 17:13, 10 February 2026
About
Design of a spring break program for 24 participants. \
Staff
- 4 hour staff training required beforehand for site staff.
- Admin - admissions and questions, coordination. Handles registration process and onboarding emails.
- Hospitality and Logistics - admissions admin, cooking and living space, signage, waste, garden, store runs. Prepares site for arrival.
- Co-teachers - 2 assistants required for teaching build process.
- Logistics - materials moving and handling with skid steer.
24 Unit Program
- Prototypes
Program
- Prep webinar - watch at your leisure. 1 hour describing the week.
- Day 1 - Welcome presentation, half hour, and half hour intros. 2 Hour Construction Boot Camp + practice wall module build - total 4 hours morning.
- Afternoon: 2 hour production. 2 hour AI Assisted FreeCAD design: how to design just about anything. Part Library work - process overview, sample part generation.
- Day 2 - 2 Hour House Design Boot Camp. Building Cabin 1.
- Afternoon - PV installation - Hangar. 2 hr CAD design - Part library work - designing plumbing.
- Day 3 - 2 Hour PV System + Roofless Roof Design Bootcamp and Design Session. Building Cabin 2.
- Afternoon - PV installation - Hangar. 2 hr CAD design -Part library work - designing electrical.
- Day 4 - 2 Hour Heat Pump and Thermal Battery Design Boot Campand Design Session. Building Cabin 3.
- Afternoon - PV installation - Hangar. 2 hr CAD design - Part library work - designing power center.
- Day 5 - House Design Finalization. Building Cabin 3.
- Afternoon - PV installation - Hangar. 2 hr CAD design -Part library work - designing HVAC.
- Day 6 - Village Design Boot camp and Design Session. Building Cabin 3.
- Afternoon - PV installation - Hangar. 2 hr CAD design -Part library work - designing HVAC.
Future Infrastructure Upgrades
- Production aquaponic greenhouse
- Pervious paver driveways, with 3D printed block