Seed Eco-Home 4 Documentation: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 3: Line 3:
*The bill of materials, at $60k - https://docs.google.com/spreadsheets/d/1gdLj8JvYkAdIkUwGFVTFmwaP_HZ9aqMLucWQEEtCTTk/edit?gid=974819817#gid=974819817  
*The bill of materials, at $60k - https://docs.google.com/spreadsheets/d/1gdLj8JvYkAdIkUwGFVTFmwaP_HZ9aqMLucWQEEtCTTk/edit?gid=974819817#gid=974819817  
*1000 pages of build details
*1000 pages of build details
**Working Doc Part 1 - Garage, Roof, Runners + PV Mounting -
**Working Doc Part 1 - Garage, Roof, Runners + PV Mounting - [https://docs.google.com/presentation/d/1AU_4ucrdGkkZlsINSIbaOVTh6lG9fWBdCCSyVI1UNQg/edit?slide=id.g20479920c78_0_0#slide=id.g20479920c78_0_0]
**Working Doc Part 2 - Foundation Skirt, Doors, Trim, Vinyl, Trellis Drop. Roping technique.
**Working Doc Part 2 - Foundation Skirt, Doors, Trim, Vinyl, Trellis Drop. Roping technique. [https://docs.google.com/presentation/d/1VgnMRi9HchaZut-AM6nJk28HFXyna09XfRaCudz1AU4/edit?slide=id.g22db16ba519_0_48#slide=id.g22db16ba519_0_48]
**Working Doc Part 3 - PV Design, Service Entrance, Module Generators, and Plumbing + PEX Subassemblies, Apertures
**Working Doc Part 3 - PV Design, Service Entrance, Module Generators, and Plumbing + PEX Subassemblies, Apertures.  [https://docs.google.com/presentation/d/1tdzMFIG1GVURzdCjLESWlnxVFdYFtxkHv2BkSII06eM/edit?slide=id.g251b8087080_0_78#slide=id.g251b8087080_0_78]
**Working Doc Part 4 - Water Supply vBOM. Module map. PEX + Plumbing vBOM. Hardscape. Electrical.
**Working Doc Part 4 - Water Supply vBOM. Module map. PEX + Plumbing vBOM. Hardscape. Electrical. [https://docs.google.com/presentation/d/1YF44L9WZ75y9LLAr8AwxbeC-K__OKJVt7FZzvzeQQ6Y/edit?slide=id.g267df4cc79a_0_0#slide=id.g267df4cc79a_0_0]
**Working Doc Part 5 - Power Wall. Power Center Finishing. Utilities, Driveway, Heat Pump
**Working Doc Part 5 - Power Wall. Power Center Finishing. Utilities, Driveway, Heat Pump
**Working Doc Part 6 - PV Combiner. DC Disconnect. Transfer Switch. Interior. Wood filler. Flooring.
**Working Doc Part 6 - PV Combiner. DC Disconnect. Transfer Switch. Interior. Wood filler. Flooring.

Revision as of 01:17, 11 April 2026

  • The full CAD assembly file in FreeCAD - https://drive.google.com/file/d/144Nv-Esxe3_kN4BwLTOm7HYDOBJqvu0S/view
  • Individual modules in FreeCAD including utilities (water, plumbing, outlets, electrical system, PV system, and more) , where the utilities are not in the full CAD assembly file above - Seed Eco-Home 4 3D CAD
  • The bill of materials, at $60k - https://docs.google.com/spreadsheets/d/1gdLj8JvYkAdIkUwGFVTFmwaP_HZ9aqMLucWQEEtCTTk/edit?gid=974819817#gid=974819817
  • 1000 pages of build details
    • Working Doc Part 1 - Garage, Roof, Runners + PV Mounting - [1]
    • Working Doc Part 2 - Foundation Skirt, Doors, Trim, Vinyl, Trellis Drop. Roping technique. [2]
    • Working Doc Part 3 - PV Design, Service Entrance, Module Generators, and Plumbing + PEX Subassemblies, Apertures. [3]
    • Working Doc Part 4 - Water Supply vBOM. Module map. PEX + Plumbing vBOM. Hardscape. Electrical. [4]
    • Working Doc Part 5 - Power Wall. Power Center Finishing. Utilities, Driveway, Heat Pump
    • Working Doc Part 6 - PV Combiner. DC Disconnect. Transfer Switch. Interior. Wood filler. Flooring.
    • Working Doc Part 7 - Utility Wall, Trim, Paint. Final Wire Routing Map.
    • Working Doc Part 8 - Cabinets, Water Heaters, Flooring, Garage Door Installation, Shelves, Final Water and Plumbing
  • Original engineering drawings from a structural engineer - Construction_Plan_Check_Document.
  • The overall documentation is found at Seed Eco-Home 4.
  • More information is found at Seed Eco-Home 2, which was the prototype prior to Seed Eco-Home (a production build).