Electrical Power in the Workshop: Difference between revisions
Jump to navigation
Jump to search
Margaret Ida (talk | contribs) No edit summary |
Margaret Ida (talk | contribs) |
||
Line 9: | Line 9: | ||
Conduit will be required to carry the heavy supply lines for the sub panels. | Conduit will be required to carry the heavy supply lines for the sub panels. | ||
[[File:Electrical_Panel_Layout.png|thumb]] | [[File:Electrical_Panel_Layout.png|thumb|800 px|center]] |
Revision as of 16:58, 19 September 2011
The Workshop will use a significant amount of electrical power.
Power Sources
Power Distribution
Design plans are now set up with one main (entry) panel, located in the utility room created as part of the supply building, and four subpanels in the workshop building. One subpanel will serve the CAD Room independently. The other three subpanels each will provide a couple of lighting circuits, 17 regular 110 V outlets for power tools, and one heavy duty 220 V outlets.
Conduit will be required to carry the heavy supply lines for the sub panels.