Line 8: | Line 8: | ||
*Jan 28th: Get quote of materials from Sweigers: | *Jan 28th: Get quote of materials from Sweigers: | ||
Insulate shop and get sheet rock. | |||
*Jan 29th: Order steam engine and lathe materials. | *Jan 29th: Order steam engine and lathe materials. | ||
Post final dwgs of mechanical engine, boiler, and layout. | |||
*Jan 30th: Research steam engine solenoid specs, post and locate. | *Jan 30th: Research steam engine solenoid specs, post and locate. | ||
Sheet rock shop space, drill in shower outlet fire boiler. | |||
*Jan 30th: Work on shop try to get liveable cookeable space. | *Jan 30th: Work on shop try to get liveable cookeable space. |
Revision as of 01:35, 26 January 2009
- Jan 26th: Complete boiler research: Feed Pump, Montotube coil winding jig, safety valve.
Finish brick laying in shop. Finish steam engine proposal. Misc: Debit card activation, skype account, Explorer showing. Time Organization program: Need linked in program.
- Jan 27th: Complete Steam pump and Lathe BOM post and post steam engine proposal.
Frame inside of Shop kitchen.
- Jan 28th: Get quote of materials from Sweigers:
Insulate shop and get sheet rock.
- Jan 29th: Order steam engine and lathe materials.
Post final dwgs of mechanical engine, boiler, and layout.
- Jan 30th: Research steam engine solenoid specs, post and locate.
Sheet rock shop space, drill in shower outlet fire boiler.
- Jan 30th: Work on shop try to get liveable cookeable space.
- Feb 1st: Rest
- Feb 2nd: Begin steam engine work upon reciveing materials: 1 week Boiler and auxilaries, safety valve, feed pumps, draft control.
- 2nd week February: Engine construction. Bore cylinder set piston rings, assemble stuffing box,
- 3rd week of February: Lower Crank Assembly, fire up system possibly by the end of the week.