CEB Press Fabrication videos: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
==Videos Needed==
*[http://makeprojects.com/Project/CEB-Shaker-Hammer-and-Shaft/1725/1#s8916 How to make coupler for shaft]
*How to connect hydraulics to solenoid.
*How to put the proper valves on solenoid (CCH)
*[http://opensourceecology.org/wiki/CEB_Press/Manufacturing_Instructions/Frame_with_main_cylinder#Step_10:_Fit_the_drawer_members How to fit the drawer members]


==Videos to be edited==
==Videos to be edited==
Line 20: Line 15:
*[http://www.youtube.com/watch?v=ZpZ0OUmGFIA&list=UUjvBN1r7UXXqmIbx_u7bIAw&index=331&feature=plpp_video Stretching the Frame]
*[http://www.youtube.com/watch?v=ZpZ0OUmGFIA&list=UUjvBN1r7UXXqmIbx_u7bIAw&index=331&feature=plpp_video Stretching the Frame]
*[http://www.youtube.com/watch?v=cIkqryssZ7o&list=UUjvBN1r7UXXqmIbx_u7bIAw&index=214&feature=plpp_video Installed Drawers]
*[http://www.youtube.com/watch?v=cIkqryssZ7o&list=UUjvBN1r7UXXqmIbx_u7bIAw&index=214&feature=plpp_video Installed Drawers]
==Videos Needed==
*[http://makeprojects.com/Project/CEB-Shaker-Hammer-and-Shaft/1725/1#s8916 How to make coupler for shaft]
*[http://opensourceecology.org/wiki/CEB_Press/Manufacturing_Instructions/Frame_with_main_cylinder#Step_10:_Fit_the_drawer_members How to fit the drawer members]

Revision as of 03:55, 27 December 2011

Videos to be edited

Please put a check Check.png when item has been edited. Please put a link in the edited section to your edited video.
Most of these just need the beginning and ends chopped off, and maybe some dead spots in the middle cut out.

I'm not sure what needs to be cut out of the one above this comment.
None of the videos below this comment have the "remix" option available.

Videos Needed