XM: Difference between revisions
Jump to navigation
Jump to search
Line 3: | Line 3: | ||
*If design is separated from build, cost increases - with reference to [[Open Capitalist Platform]]. How to incorporate rapid delivery into Open Capitalist Platform. | *If design is separated from build, cost increases - with reference to [[Open Capitalist Platform]]. How to incorporate rapid delivery into Open Capitalist Platform. | ||
*Assure integration via [[Contract-First Manufacturing]] (CFM) | *Assure integration via [[Contract-First Manufacturing]] (CFM) | ||
**Example of excellent interface - [http://littlebits.cc/] | **Example of excellent interface - [little bits - http://littlebits.cc/] | ||
*Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM) | *Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM) | ||
**TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping | **TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping | ||
[[Category:XM]] | [[Category:XM]] |
Revision as of 03:21, 10 March 2012
Extreme Manufacturing Notes
- If design is separated from build, cost increases - with reference to Open Capitalist Platform. How to incorporate rapid delivery into Open Capitalist Platform.
- Assure integration via Contract-First Manufacturing (CFM)
- Example of excellent interface - [little bits - http://littlebits.cc/]
- Process: Breakdown -> CFM -> Test-Driven Manufacturing (TDM)
- TDM=Before any prototyping occurs, a test is defined to measure success of that prototyping