XM Metalevel: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
(Redirected page to XM Control Panel Howto)
 
Line 1: Line 1:
The Development Steps assume that there is a framework of a Scrum Master and a Product Owner who 'run' the development process. The assumption is further that there is an organization - OSE - providing funding for this development. Further, the organization is responsible for recruiting Advisers and Subject Matter Experts who can enhance the velocity greatly.
#Redirect [[XM Control Panel Howto]]
 
The Scrum Master is key in accelerating the process:
*Scrum Master works both locally (Factor e Farm) and Globally (remote collaboration and remote swarming (Flash Mobs))
*World can view and join at any time. By assuring that ALL the steps are documented, anyone in the world can begin contributing.
**Buzz is generated when updates are constant.
*Task done on backlog qualifies a person to join a team.
*Person joining team qualifies to vlog and log tasks in completion log
*Flash Mobs are engaged for swarming on problems
*Advanced techniques such as 3D scans are generated to produce rapid CAD design
*CAD and Design can be done rapidly via remote swarms
*Prototyping work can be done rapidly at Factor e Farm with 12 Fabricators + 12 Assistants
*Remote fabrication can happen at TechShop or Home Machine Shop
*Rapid Fabrication and Design can be leveraged
**Requires CAD swarm and design swarm - first focuses on documentation, other focuses on design - 1 hour per week.
*Rapid Prototyping/Testing can be leveraged
**CAE swarming, 3D print swarming (For rapid prototypes), High School fab shops, Makerspaces
 
==Minimum Management Required:==
 
*12 fabricators at factor e farm (2 currently)
*1 FeF documenter + upload strategy
*10 scrum masters, 10 project owners
**Needs weekly on-demand housing
*COO (manages Scrum)
*CEO (manages Project)
*CFO (Aaron)
Budget - $64k/month in management (32 people at $2k stipend, halp at Factor e Farm + half remote, then 25 on-site by Quarter 4)
 
==Capacity==
We can currently house a max of 15 people. Camping space is unlimited.
 
==Volunteers Required:==
 
*crowd-source documentation talent in the summer (film and journalism schools),
*Flash Design, CAD, CAE via volunteer engineers in Flash Mobs, supported via nonprofit sector; work with EWB
*Flash CAD via Sketchup to CAD conversion
*1 mechanic for machine testing
*Crowdsource CAD from nonprofit
*Scaling Calculation Flash Mobs
 
==Strategy==
*Due Diligence via Scrum Master and Product Owner who are guided by an Advisory Board of Titans (100-200 advisors)
**Mine via TED, EWB, LifeBoat, OSE True Fans + Supporters, Professional Headhunter, and others.
*Recruit full-time community manager for Flash Mob talent.
**Flash Mob Brief - from Due Diligence
**1.5 hour design session on Google Hangout.
 
[[Category:XM]]
 
 
[[Category:XM]]

Latest revision as of 21:00, 1 April 2012