This charts shows the per person time requirement for building out a complete | This charts shows the per person time requirement for building out a complete infrastructure, AND building the equipment base with 1 person. Note that the agriculture and construction is shared between 30 people, while fabricator training and eqiupment fabrication is done solo. This is because any community needs a minimum of only one master fabricator in terms of time requirements for maintaining lifetime design equipment. As a good community design, however, having as many fabricators as possible is a better design. | ||
{| | {| |
Revision as of 23:27, 22 March 2009
Introduction
This charts shows the per person time requirement for building out a complete infrastructure, AND building the equipment base with 1 person. Note that the agriculture and construction is shared between 30 people, while fabricator training and eqiupment fabrication is done solo. This is because any community needs a minimum of only one master fabricator in terms of time requirements for maintaining lifetime design equipment. As a good community design, however, having as many fabricators as possible is a better design.
ITEM | DAYS REQUIRED per person |
Nnuresery propagation | 7 |
Animal setup | 14 |
100 trees per day | 7 |
4 raised beds per day | 5 |
digging a well | 1 |
swaling and ponds | 15 |
1000 sq ft greenhouse | 30 |
lumber milling | 2 |
brick pressing | 2 |
building | 30 |
workshop training | 60 |
equipment fabrication | 180 |
TOTAL | 353 |