Modular Stove Fabrication Procedure: Difference between revisions
Jump to navigation
Jump to search
(Created page with "Start with BOM. Then, the build: <html> </html>") |
No edit summary |
||
Line 1: | Line 1: | ||
=BOM= | |||
Start with BOM. | Start with BOM. | ||
=Build= | |||
==Step 0== | |||
Study Concept: 2 boxes with slideable cover plates clamped down. Ash tray and flame deflector plates side in similar fashion. | |||
*Cut angle for 2 mitered frames, just like for [[Power Cube 6]] | |||
[[Image:Miteredframe.png]] | |||
Then, the build: | Then, the build: | ||
<html> | <html> | ||
</html> | </html> |
Revision as of 20:20, 16 October 2012
BOM
Start with BOM.
Build
Step 0
Study Concept: 2 boxes with slideable cover plates clamped down. Ash tray and flame deflector plates side in similar fashion.
- Cut angle for 2 mitered frames, just like for Power Cube 6