Modular Stove Fabrication Procedure: Difference between revisions
Jump to navigation
Jump to search
(→Step 3) |
(→Step 2) |
||
Line 18: | Line 18: | ||
*Cut angle for 2 mitered frames, just like for [[Power Cube 6]]. 1/4"x2"x2" angle BOM: | *Cut angle for 2 mitered frames, just like for [[Power Cube 6]]. 1/4"x2"x2" angle BOM: | ||
[[Image:Miteredframe.png|300px]] | [[Image:Miteredframe.png|300px]] | ||
**Use Ironworker for mitered cuts: | **Use Ironworker for mitered cuts: |
Revision as of 00:08, 17 October 2012
BOM
Start with BOM.
Mild Steel
- 1/4"x2"x2" angle - $2.41/ft
- 1/8"x1/2"x1/2" angle - $0.66/ft
- 1/8"x4'x8' sheet - $100
Build
Step 1
Study Concept: 2 boxes with slideable cover plates clamped down. Ash tray and flame deflector plates side in similar fashion.
Step 2
- Cut angle for 2 mitered frames, just like for Power Cube 6. 1/4"x2"x2" angle BOM:
- Use Ironworker for mitered cuts:
- Result: corners fit together such that all metal angle form flat planes
Quality Control
- 3 corners fit so there is no more than 1/8" space anywhere
- length of members within 1/4" tolerance
Then, the build:
Step 3
- Weld frame as this: