Modular Stove Fabrication Procedure: Difference between revisions
Jump to navigation
Jump to search
(→Step 2) |
(→BOM) |
||
Line 1: | Line 1: | ||
=BOM= | =BOM= | ||
Start with BOM. | Start with BOM. | ||
*[12] - 4' long | |||
*[18] - 2' long | |||
*[6] - 1' long | |||
==Mild Steel== | ==Mild Steel== | ||
*1/4"x2"x2" angle - $2.41/ft | *1/4"x2"x2" angle - $2.41/ft |
Revision as of 00:09, 17 October 2012
BOM
Start with BOM.
- [12] - 4' long
- [18] - 2' long
- [6] - 1' long
Mild Steel
- 1/4"x2"x2" angle - $2.41/ft
- 1/8"x1/2"x1/2" angle - $0.66/ft
- 1/8"x4'x8' sheet - $100
Build
Step 1
Study Concept: 2 boxes with slideable cover plates clamped down. Ash tray and flame deflector plates side in similar fashion.
Step 2
- Cut angle for 2 mitered frames, just like for Power Cube 6. 1/4"x2"x2" angle BOM:
- Use Ironworker for mitered cuts:
- Result: corners fit together such that all metal angle form flat planes
Quality Control
- 3 corners fit so there is no more than 1/8" space anywhere
- length of members within 1/4" tolerance
Then, the build:
Step 3
- Weld frame as this: