Chuck Log: Difference between revisions
Jump to navigation
Jump to search
Line 7: | Line 7: | ||
* replaced mechanical microswitches on X1-X2 axis with photointerrupters..success. [[Stepper_Testing#opto|Testing]] | * replaced mechanical microswitches on X1-X2 axis with photointerrupters..success. [[Stepper_Testing#opto|Testing]] | ||
* contact Kavitha to coordinate torch table prep for Dec. 18 CEB build. | * contact Kavitha to coordinate torch table prep for Dec. 18 CEB build. | ||
* research CNC oxyfuel torch cutting [CNC_Torch_Table] | |||
* research onsite oxygen generation (PSA) | |||
* order some gas valves off eBay | |||
== 25-Nov-2012 thru 31-Nov-2012 == | |||
* got update from FEF regarding Dec 18 CEB build: no oxyfuel, using PP60 plasma on torch table, new tool chain with ImplicitCAD | |||
== 11-Nov-2012 thru 17-Nov-2012 == | == 11-Nov-2012 thru 17-Nov-2012 == |
Revision as of 16:01, 26 November 2012
Intro
A chronological log for Chuck Harrison, occasional off-site collaborator.
Log
18-Nov-2012 thru 24-Nov-2012
- sync grbl to upstream..success.
- replaced mechanical microswitches on X1-X2 axis with photointerrupters..success. Testing
- contact Kavitha to coordinate torch table prep for Dec. 18 CEB build.
- research CNC oxyfuel torch cutting [CNC_Torch_Table]
- research onsite oxygen generation (PSA)
- order some gas valves off eBay
25-Nov-2012 thru 31-Nov-2012
- got update from FEF regarding Dec 18 CEB build: no oxyfuel, using PP60 plasma on torch table, new tool chain with ImplicitCAD
11-Nov-2012 thru 17-Nov-2012
- start log.
- ship Millermatic 200 welder (Seattle craigslist) by LTL truck to FEF. 400 lbs for $500; was that reasonable?
- steppernug (open source stepper driver) schematic review with Darren
- received photointerrupters for torch table testing
- looking into "does not quite reach position" bug in my grbl branch
Ancient history
First contact with OSE Sept 2011 briefly on site. I was in the area visiting relatives David Ihnen and Margaret Havens.