June 22, 2013 Sprint Introduction: Difference between revisions

From Open Source Ecology
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 2: Line 2:


We have 8 tons of metal coming in next week, and the hydraulics are here. We have at least 6 Power Cubes to work with.
We have 8 tons of metal coming in next week, and the hydraulics are here. We have at least 6 Power Cubes to work with.
Orientation:
[[Dashboard]]
[[

Latest revision as of 14:17, 22 June 2013

Welcome to our June 22 Design Sprint. Today is the last sprint prior to our 10 day Build Sprint. However, we do intend to run a Design Sprint next week while we do a Build Sprint at Factor e Farm. This depends on us recruiting a collaborator who can manage contributions at the same time that we run physical buildout at Factor e Farm. This is our general pathway moving forward as we scale our global collaboration.

We have 8 tons of metal coming in next week, and the hydraulics are here. We have at least 6 Power Cubes to work with.

Orientation:

Dashboard [[