Chris Bassett Log
Chris Bassett Log
7/13/2013 Design Sprint. Set Goals to work out details of acetylene/oxygen controls between tanks and torch head (Gas Delivery System). Review mechanics of slider gantries on table in solidworks for design considerations.
7/15/2013
Learned out to work GIT HUB to access file repositories. Need to download application. A tutorial can be found here: https://help.github.com/articles/fork-a-repo
The application can be found here: https://help.github.com/articles/set-up-git
Checked that the solid works file loaded - successful. Will review in detail later
Researched Prior Work. Will build upon prior torch mounting systems of hose clamps holding a modified torch head. Learned the stepper motors move the gantry using rack and pinions.
The prior flying gantry used two rails in parallel to stabilize rotation. From the model, v2 of the Torch the flying gantry will slide on one rail so some suitable bracking will need to happen.
Changes to consider in tool head design.
Standards for oxy-acetylene systems: Threading is 1/4 NPT, LH threading for acetylene connections. Valves should be "grease-less" for prevention of combustible contaminants
Solenoid For Cutting Oxygen Flow: http://www.mcmaster.com/#standard-brass-solenoid-valves/=nmzf4c