Eric Potash Log
Thu Mar 12, 2014
Adapted rotor shaft to coupler (keyway and setscrews). Adjusted spacing of tine modules to put 3" between neighboring tine ends and 3½" to bucket sides. Adjusted length of shaft to accomodate coupler, bearings and collar. See File:Rotor.scad.
Exported File:Rotor.stl including to integrate with SketchUp. See OpenSCAD#Import scaling.
Wed Mar 12, 2014
Minor changes to tine_module in File:Rotor.scad.
Worked through exporting from OpenSCAD to STL (e.g. File:Tine module.stl) and importing results in SketchUp. Documented the process in OpenSCAD#Collaboration. Continued limewashing and painting the HabLab.
Tue Mar 11, 2014
Modeled rotor in scad: File:Rotor.scad. Limewashed the HabLab.
Mon Mar 10, 2014
Worked on Soil Mixer Drawing. Mixed and applied first layer of plaster in MicroHouse. Modeled tractor interface in openscad File:Tractor interace.scad and exported stl File:Tractor interace.stl.
Sun Mar 9, 2014
Brainstormed Soil Mixer Design Requirements. Stripped plaster in MicroHouse and put up chicken wire. Modeled the OSE grid beam in openscad File:Grid beam.scad.