Brenna log
June 11th, 2014
Began prep for building gazebo (weed whacked, drilled holes in 5 gallon bucked and installed rebar crosses and concrete for reinforcement, laid out stakes 85" and 60 degrees from each other)
June 10th, 2014
Finished installing exterior skin on laser cutter
Fri, June 6th, 2014
Drilled holes for exterior skin and plastic door panels using LasersaurSkinDrillHoles and Lasersaur's online manual
Thurs, June 5th, 2014
Lasersaur work: rerouted e-stop switch wiring to eliminate collision with exterior panels
Rerouted door switch wiring to eliminate collision with plastic door panel
Wed, June 4th 2014
Started drawer guide manual for CEB press File:Drawerguide.zip
Completed reassembly of CEB press
Tue, June 3rd 2014
Cleaned up workshop
Started brick press assembly
Mon, June 2nd 2014
Removed frame on power cube
Installed screen doors upside down on hablab
Flipped screen doors over