Factor e Farm Utilities

From Open Source Ecology
Revision as of 05:24, 13 April 2020 by Marcin (talk | contribs) (→‎Links)
Jump to navigation Jump to search

2019

Power

Connecting Faculty House and Seed Eco-Home to 200A and 100A service.

edit

Internet

edit

Notes:

  • DSL internet from Centurytel has been discontinued as of late 2018 due to its top speed of only 4 Mbps

Install

Try 1 - after which we got a larger ride-on trencher.

2014 Grid, Water, Internet

Microhouse 4 Utilities Extension:

edit

2013 Water + DSL

Notes:

  • Right side power line is not in use. It was installed from the huts to the old workshop initially, but was never used as the old workshop was off-grid on solar + Power Cubes in the early days. Since then the line was forgotten, and it may have been upearthed when the parking lot to the east of the new workshop was built.
  • Water line going east is usable. It has never been put into service as of 2019, but should be for an RV campsite along with 200A service for RVs.

Links