Under Construction Phase Inspections

From Open Source Ecology
Revision as of 04:45, 10 January 2022 by Marcin (talk | contribs) (→‎Foundation)
Jump to navigation Jump to search

References

  • Document for Alaska - [1]
  • Inspection Descriptions - [2]

Site Plan

  • this is the first inspection

Foundation

  • Slab inspection happens before pouring
  • Plumbing under-slab may be inspected prior to covering

Rough-in inspections include plumbing, electrical, and framing:

Electrical

  • includes wiring and breakers
  • Includes ground conductor
  • Includes all enclosures - breaker boxes, outlet boxes
  • Switches, receptacles and fixtures should not be installed at the rough-in.

Plumbing and Mechanical

  • Prior to any enclosure, plumbing is inspected
  • Includes water, drain, waste, and vents
  • Includes HVAC vents; range, dryer and bathroom vents; water heater and venting; others. If water heater is not fuel-fired,

Framing

  • Includes both interior and exterior walls, load bearing or not. Inspection is done after all rough-in plumbing and electrical, and ducting is in place.