Once exterior walls are done, interior walls may be installed. There is a specific procedure for interior work, which involves marking of everything:

  • Wall, floor, ceiling apertures - vents, lights, wires, plumbing, heat pump, electrical boxes. These may be interior or exterior, where waterproofing is done after the framing and before insulation.
  • Footprints of structures- eg landing, cabinets, toilet, tub, etc. Important to mark

Work doc for SEH 4 - [1]