RLF Build Log

From Open Source Ecology
Revision as of 21:37, 4 August 2025 by Marcin (talk | contribs)
Jump to navigation Jump to search

Work Doc

edit

Mon Aug 4, 2025

  • Header - used tiedown strap to pull in sides, as right side was 1.5" off vertical. Cut header to fit. Nailed through king stud. [1]

Sat Aug 2, 2025

  • Major lessons - no mods to modules.
  • Numbered and prepared ahead of time.
  • Major block once the T caps entered - blocking was impossible so it meant drilling holes to attach blocking. And slitting the OSB, weakening shear capacity.