OSE Botswana

From Open Source Ecology
Revision as of 10:02, 14 August 2025 by Kenmakunga (talk | contribs) (→‎2025)
Jump to navigation Jump to search

2025

Thursday, August 14, 2025

  • See LinkedIn - 🇧🇼 Title: “A New Dawn: Botswana’s Rebirth is unfolding” - [1]
  • Shape Botswana's Future - [2]
  • Open Source Ecology Botswana (OSEB) Ideas for the Botswana Economic Transformation Program - [3]
  • OSEB Ideas for the BETP - Abridged Version - [4]
  • OSEB Financial Projections - [5]
  • Botswana Economic Transformation Programme Call for Ideas Submission Form - [6]

OSE Botswana Plan

Africa Budget, Africa Pilot, Citizen Entrepreneurial Development Agency (CEDA)[7], Local Enterprise Authority (LEA)[8] for funding.

Business Plan Draft

https://docs.google.com/document/d/1if8J_cMsjpGxNN9tUYF0azJIIjbIunTOBkUrExHRIXE/edit

Land Allocation

Approximately 92.8 hectares (229 Acres) available for site of OSE Botswana - Location Mantshadidi Near Palapye, Botswana (GPS Coordinates TBA) Sample certificate of one of the plots of land allocated to Makunga Family members: File:Certificate of Customary Land Grant.pdf


OSE Microfactory and Campus Botswana

Planning:

  • need water - borehole?
  • Power - Generator to power welders
  • Foundation Slab - for workshop: 15m x 20m with roof.
  • CEB press parts
  • Toilets and showers

1st phase need workshop and CEB press to begin building infrastructure - staff housing, dorms & cabins. Need Site plan. CEB house plans, dorms and cabin plans. Bus in casual labourers to build infrastructure. Fly in MJ & CM for CEB build and other machines for workshop.