Adam Log

From Open Source Ecology
Revision as of 01:02, 22 August 2011 by Chris F (talk | contribs)
Jump to navigation Jump to search

8/18

Erected posts and poured concrete for new mill shed beside workshop.

8/20

Moved felled logs to stack behind mill shed. Spread old CEB across ground for new shop. Began clearing land with new box blade.

8/21

Cleared out felled walnut tree, deposited branches near wood chipper in orchard. Put usable walnut wood in a pile behind mill shed