CEB Press/Manufacturing Instructions/Leg Holders

From Open Source Ecology
Jump to navigation Jump to search

You will need 14 of these per machine. They are required for Arms - secondary (8), Feet(4), Frame with main cylinder (2)

Tools Required:

  • Torch
  • Welder

Materials Required:

  • 2 1/2” x 2 1/2" x 3/16" square steel tubing – 6” long (1)
  • 3/4” nut (1)
  • 3/4” x 2” bolt (1)

Fabrication Instructions:

  1. Torch a 3/4” hole in the center of one of the faces of the tubing; make sure it's large enough for a 3/4” bolt
  2. Weld the nut over the hole, ensuring the nut is level, and the hole is clear. Make sure no spatter goes into the threads by covering the top of the nut.
  3. Thread the bolt into the nut.