CEB Press/Manufacturing Instructions/Sensor Unit
Jump to navigation
Jump to search
Main > Housing and construction > CEB Press > CEB press building instructions
Tools Required
- solder iron
- heat gun
- wire cutter/stripper
- lighter
Materials Required
- hall effects sensor
- 1/2" poly pipe 5/8" o.d.
- underground telephone cable 4 wire
- potting compound
- disposable mixing cups
- tape
- cat5 cable
- shrink wrap
Diagrams
Fabrication Steps
- cut telephone cable 70" long
- strip shielding plastic 1.5" and 8" at either end
- solder hall effects sensor