OSE Roof Instructions

From Open Source Ecology
Jump to navigation Jump to search

ASSEMBLY SHEET FOR WORKSHOP ROOF STRINGERS

  • Assemble supplies and tools:
    • (14)2x6"x16' beams for each set of assemblies.
    • 2-1/2 large tubes of Liquid Nails for each assembly
    • 3" deck nails
    • Circular saw
    • Power source
    • Pencil
    • Tape measure
    • Carpenter's square
    • Power screw drivers
    • Clamps (>5")
    • Saw horses
  • Measure and mark each of the following beams
    • Next to the cut line mark the size of the board on that side of the line
  • One 16’ 2x6” beam to create one 10’8” piece and one 5’4” piece
  • One 16’ 2x6” beam to create one 10’ piece and one 6’7/8" piece
  • Two 16’ 2x6” beams to create two 11’7/8" pieces and two 5’ pieces
  • One 16’ 2x6” beam at 15’ in length (cut off 1'7/8").
  • One 16’ 2x6” beam with a diagonal 1'9-7/8" from one end.
  • One of the 11'7/8" pieces with a diagonal 1'9-7/8" from one end
  • Cut the marked pieces.
  • Lay out a 32’ assembly as shown in the diagram
  • Start 2 screws at the end of each outside beam piece.
  • Spread glue on one 5-1/2” face of the center beam pieces.
  • Set one set of outside beams on the glued pieces.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
  • Turn the assembly over and spread glue on the other 5-1/2" face of the center beam pieces.
  • Set the other set of outside beams on the glued pieces.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
  • Lay out a 43”6-1/2" assembly as shown in the diagram.
  • Start 2 screws at the end of each outside beam piece.
  • Spread glue on one 5-1/2” face of the center beam pieces.
  • Set one set of outside beams on the glued pieces.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
  • Turn the assembly over and spread glue on the other 5-1/2" face of the center beam pieces.
  • Set the other set of outside beams on the glued pieces. Be sure the points of the diagonal cuts are on the same side of the stringer.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.

Make (5) 32" workshop assemblies and (5) 43"6-1/2" assemblies.

ASSEMBLY SHEET FOR SUPPLY SHED ROOF STRINGERS

  • Assemble supplies and tools:
    • (6)2x6"x16' beams for each set of assemblies.
    • 1 large tubes of Liquid Nails for each assembly
    • 3" deck nails
    • Circular saw
    • Power source
    • Pencil
    • Tape measure
    • Carpenter's square
    • Power screw drivers
    • Clamps (>5")
    • Saw horses
  • Measure and mark the following beams
    • Next to the cut line mark the size of the board on that side of the line
  • Two 16’ 2x6” beam to create two 10’8” pieces and twoe 5’4” pieces.
  • Lay out a supply shed stringer assembly as shown in the diagram.
  • Start 2 screws at the end of each outside beam piece.
  • Spread glue on one 5-1/2” face of the center beam pieces.
  • Set one set of outside beams on the glued pieces.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.
  • Turn the assembly over and spread glue on the other 5-1/2" face of the center beam pieces.
  • Set the other set of outside beams on the glued pieces.
  • Clamp at each beam end and screw together as shown in the detail, adding more screws at about 18” intervals.

Make 2 assemblies.



RoofStringers.png