Modular Stove Fabrication Procedure
Jump to navigation
Jump to search
BOM
Start with BOM.
Build
Step 1
Study Concept: 2 boxes with slideable cover plates clamped down. Ash tray and flame deflector plates side in similar fashion.
Step 2
- Cut angle for 2 mitered frames, just like for Power Cube 6.
- Use Ironworker for mitered cuts:
- Result: corners fit together such that all metal angle form flat planes
[[Image:mitered.jpg|300|Mitered corners with 2"x2" angle
Quality Control
- 3 corners fit so there is no more than 1/8" space anywhere
- length of members within 1/4" tolerance
Then, the build:
Step 3