Chuck Log

From Open Source Ecology
Revision as of 03:52, 19 November 2012 by ChuckH (talk | contribs) (→‎Log)
Jump to navigation Jump to search

Intro

A chronological log for Chuck Harrison, occasional off-site collaborator.

Log

18-Nov-2012 thru 24-Nov-2012

  • sync grbl to upstream..success.
  • replaced mechanical microswitches on X1-X2 axis with opto sensors..success

11-Nov-2012 thru 17-Nov-2012

  • start log.
  • ship Millermatic 200 welder (Seattle craigslist) by LTL truck to FEF. 400 lbs for $500; was that reasonable?
  • steppernug (open source stepper driver) schematic review with Darren
  • received photointerrupters for torch table testing
  • looking into "does not quite reach position" bug in my grbl branch

Ancient history

First contact with OSE Sept 2011 briefly on site. I was in the area visiting relatives David Ihnen and Margaret Havens.