Gabriel Kind log
Jump to navigation
Jump to search
June 4
- Finished Grate instructional for the CEB
- Installed new internet connection from the mud huts (Nope, broken again, will fix tomorrow)
- Implanted gcode into the torch table for testing purposes.
June 3
- Organized power tool and began to label shelves and drawers
- Began construction and time lapse of Liberator
- Found potential solutions to implanting a modified gcode file manually to the torchtable
- Researched burying a cat5 cable (notes)
June 2
- Augmented the Collaboration Architecture slideshow to include instructions about installing SketchUp on Ubuntu 12.04
- Recorded and participated in Liberator deconstruction time lapse
- Assisted in Ubuntu installations
- Recorded extension cord salvation
- Planted tomatoes and soy
June 1
- Constructed a proposal for youtube raw media upload standards
Ongoing todo list
- Continue to compress and upload my footage to youtube
- Polish youtube raw uploads specifications
- List wiki dev pages