Workshop Readiness Assessment

From Open Source Ecology
Revision as of 08:16, 14 April 2015 by Marcin (talk | contribs) (Created page with "To determine whether a product is ready to be produced in a successful workshop, here are some considerations? #What is the current build time? #How many units have been buil...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

To determine whether a product is ready to be produced in a successful workshop, here are some considerations?

  1. What is the current build time?
  2. How many units have been built?
  3. What bugs exist in the design?
  4. What are the challenges during the build?
  5. What is the build preparation time for sourcing materials and preparing workshop documentation?
  6. What is the material cost per unit?