MicroTrac v17.10 Build Data Collection

From Open Source Ecology
Revision as of 02:26, 29 May 2018 by Marcin (talk | contribs)
Jump to navigation Jump to search
  • Hand torching of drive sprockets worked
  • Entire machine was hand torched by multiple people with acceptable results:

  • Loader arms were fit in place on 3" solid CR shaft:

  • 14 people participated in build

  • Hose protectors installed.

Days

  • 5. Shaft inserted, frame and motors are on. Second track is conncted. Power cube is inserted + arms. Quick attach plate is mounted. Cylinders are mounted.