Data from Oct 2019. For future reference:

Ameren

  • Ameren Ameren Construction Line: 314-992-6619
  • Ameren Contractor Doug Alberti - 816-629-2835
  • Ameren pays for first 1000
  • Nearest pole to Seed Eco-Home is by neighbor's barn, between 1600 and 1800 ft from us
  • Cost is $8 to $10 per ft (after first 1000 ft) - around $8000. Lowest limit - $4800 - Upper limit - $8k - not counting trenching
  • We'd be responsible for trenching from driveway to house
  • Our electrician installs meter box - we buy meter

United Electric Co-Op

  • Talked to Glenn
  • United pays for first 250 ft, after that it's $8.4 per foot.
  • Nearest pole is closest house on Frank Ross Rd. (around 2000 ft) - same location our fiver connection was pulled from. That would be $14.7k